A Bradford company - serving Jacksonville, FL
A remodeled primary bathroom with a soaking tub and a walk-in shower

Tub-to-Shower Conversion Cost - Fixed Price, One Bathroom at a Time

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Jacksonville
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A low-threshold walk-in shower with a bench and grab bar
A powder room with botanical wallpaper and a stone sink
A wood double vanity with two mirrors after a bathroom remodel
A remodeled primary bathroom with a soaking tub and walk-in shower
A freestanding soaking tub in a remodeled primary bathroom
A whole-home remodel with the living, dining and kitchen areas opened up
A second-story addition that matches the existing roofline
A galley kitchen opened up to the dining room with a new peninsula
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as$199/month*On approved credit; ask for current terms
Get your free estimate
Explore

Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

How Much Does Tub-to-Shower Conversion Cost in Jacksonville?

A tub-to-shower conversion in Jacksonville typically costs between $3,500 and $10,000, with most homeowners in neighborhoods like Mandarin, Riverside, and San Marco paying $6,000 to $8,500 for a standard 5-foot alcove conversion with mid-range finishes. The price includes demolition of the old tub, plumbing adjustments, shower pan installation, wall surrounds or tile, and a new valve and showerhead. Permits, accessibility upgrades, and custom tile work push the number toward the top of that range.

That’s the straight answer. What follows is the full breakdown of where those dollars go, what drives the price up or down in Jacksonville specifically, and how to avoid paying for surprises at the end of the job.

Key Takeaways:

  • Standard tub-to-shower conversions in Jacksonville run $3,500 – $10,000, with most falling between $6,000 and $8,500.
  • Demolition and plumbing rough-in work account for roughly 30 – 40% of the total cost.
  • Acrylic or fiberglass surrounds are the most affordable wall option; tile adds $1,500 – $4,000 depending on material and layout.
  • Permits in Jacksonville and the beaches communities add $100 – $400 depending on the scope of plumbing changes.
  • A written, itemized price before work starts is the single best protection against mid-project price creep.
A remodeled hall bathroom with subway tile and a floating vanity

Tub-to-Shower Conversion Cost Breakdown (2026)

Every tub-to-shower conversion involves the same core phases: demolition, plumbing, waterproofing, surface installation, and finish plumbing. Here’s how those phases price out in the Jacksonville market as of 2026.

Line Item Typical Jacksonville Cost Notes
Demolition and disposal (old tub, surround, valve) $400 – $800 Includes haul-away; fiberglass removal is faster than cast iron.
Plumbing rough-in (drain relocation, valve replacement, supply lines) $700 – $1,800 Relocating the drain from tub position to center-of-shower adds cost.
Waterproofing and substrate prep (backer board, membrane, leveling) $600 – $1,500 Florida humidity makes proper waterproofing non-negotiable. In older Jacksonville homes with wavy studs, shimming and straightening adds labor.
Shower pan / base installation $500 – $1,200 Prefabricated acrylic pans cost less; mortar-bed and tile pans run higher.
Wall surround or tile installation $900 – $3,800 Acrylic/fiberglass surrounds at the low end; custom tile with Schluter or Wedi systems at the high end.
Shower valve, trim, and showerhead $250 – $900 Delta and Moen valves at the mid-range; thermostatic valves and rainfall heads add cost.
Glass shower door or curtain rod $200 – $1,200 Frameless glass is the top end; rod and curtain is the budget route.
Permits and inspections $100 – $400 City of Jacksonville building permit; beaches municipalities (Atlantic Beach, Neptune Beach, Jacksonville Beach) have separate fee schedules.
Finish work (trim, caulk, sills, threshold) $150 – $400 Includes silicone at all change-of-plane joints and base transitions.

These line items assumed a standard 5-foot alcove tub footprint, which keeps the drain roughly in place and avoids moving the toilet or vanity. When the footprint changes, so does the price. A 60-inch Alcove tub replaced with a same-size shower is the most economical conversion. Stretching the shower to 60 by 36 or 60 by 42 inches, adding a bench, a curbless entry, or a second showerhead each add $800 to $2,500 depending on what’s involved.

Materials account for about 35 – 45% of the total. Labor accounts for the rest. In Jacksonville, labor rates for a licensed remodel contractor with plumbing sub-trade work factor into the mid-to-upper half of these ranges. Bradford Remodeling writes the material allowance, the labor, and the permit fees as separate lines on the proposal, so if you decide to upgrade the tile mid-project, the price change is itemized in writing before we order it. That’s the only way we work.

What Affects Tub-to-Shower Conversion Pricing in Jacksonville

Not every tub-to-shower conversion in Jacksonville costs the same. These are the factors that most directly move the number on a proposal.

1. The Age and Construction of the House

Jacksonville’s older housing stock is part of what makes tub-to-shower conversion pricing so variable. Homes built before 1990 in Riverside, Avondale, Springfield, and San Marco often have cast-iron tubs, galvanized supply lines, and drain plumbing that’s undersized by current code. Hauling out a 300-pound cast-iron tub is real labor, and re-piping old galvanized lines to the new shower valve can add $500 – $1,200 to the plumbing line item. Newer construction in Bartram Park, Nocatee, or eTown typically has PVC drains, PEX or copper supply in good condition, and standard 5-foot alcoves that come apart and go back together without surprises.

2. The Shower Base and Waterproofing Method

A prefabricated acrylic shower base with an acrylic surround is the lowest-cost option and can often be installed in one to two days. A mortar-bed tile floor with a bonded waterproofing membrane costs more in both materials and dry time. We see a lot of Jacksonville homes with slab-on-grade foundations in areas like Arlington and the Westside where we’re working directly on concrete, and that changes how the drain is positioned and how the base is set. Curbless showers, which are popular with aging-in-place remodels in the beaches and Ponte Vedra area, cost more because the floor framing or slab has to be recessed to achieve the zero-threshold entry.

3. Wall Finish: Surround vs. Tile vs. Custom Tile

An acrylic or fiberglass surround runs $900 – $1,800 installed. Ceramic or porcelain tile in a standard subway or 12 by 24 layout runs $1,800 – $3,200. Large-format porcelain, glass tile accents, a niche, a bench, and pencil-liner detailing push tile work into the $3,000 – $4,500 range. The material cost matters, but so does the square footage of wall and the number of cuts. Every niche, shelf, and window reveals additional waterproofing and trim, and that shows up on the tile line item.

4. Plumbing Scope: Valve, Drain, and Supply Lines

If the existing tub valve is in decent shape and the drain is in a workable position, you’re at the low end of the plumbing range. But most homeowners converting a tub want a pressure-balanced valve at minimum, and many want a thermostatic valve, a separate handheld sprayer, or a slide bar. Each added outlet adds $150 – $400. If the drain needs to move more than a few inches, or if the home still has galvanized supply lines that have to be cut back and adapted, the plumbing line item goes up accordingly. This is not a line item where Jacksonville homeowners should accept a vague “plumbing included” figure. The specific valve model, the number of outlets, and the drain work should all be named in the proposal.

5. Permits and Code Requirements

Jacksonville requires a plumbing permit for any work that modifies the drain, trap, or water supply lines. A tub-to-shower conversion almost always involves at least some of that. The City of Jacksonville Building Inspection Division permit for this scope typically runs $100 – $300, depending on the valuation of the work. The beaches cities, Atlantic Beach, Neptune Beach, and Jacksonville Beach, maintain their own fee schedules, which are close but not identical to the city’s. Pulling the permit properly means an inspection of the rough-in plumbing and waterproofing before the walls close up. That inspection protects you. A contractor who skips it is offering you a discount that could cost you when you sell the house and the unpermitted work shows up on the seller’s disclosure.

6. The Site Conditions

Upstairs bathrooms add stair work for hauling debris and materials, but the real variable is what’s behind the walls. In homes built before the mid-1980s across Jacksonville’s older neighborhoods, we regularly open a tub surround to find water damage in the studs, mold at the base plate, or a subfloor that’s been leaking around the tub flange for years. When we find rot, which is common in Florida’s humidity, the repair goes on the proposal as a written change order before any additional work happens. Homeowners who’ve been through a surprise-invoice remodel before usually appreciate seeing exactly what was found and exactly what it costs to fix it.

A remodeled hall bathroom with patterned floor tile and painted walls

How to Save on Tub-to-Shower Conversion

This is where we tell you how to keep the price down without cutting corners that’ll bite you later. Most of the savings in a Jacksonville tub-to-shower conversion come from scope decisions, not from finding a cheaper contractor. A cheaper contractor often costs more the second time.

  • Keep the existing footprint. Staying in the same 60-inch by 30-inch alcove avoids moving the drain and resetting the floor. That’s the single biggest line-item saver.
  • Choose an acrylic surround over tile. A quality acrylic surround from a brand like Kohler or Sterling, installed over properly prepped substrate, cuts $1,500 – $3,000 off the tile route. It also cuts a day or two of labor and dry time.
  • Stick with a standard pressure-balanced valve. Thermostatic valves and multi-outlet systems are worth it for some homeowners, but if you’ve been fine with one showerhead for 20 years, a quality Delta or Moen pressure-balanced valve with a single outlet is all you need and saves $200 – $500.
  • Use a shower curtain instead of a glass door at first. A framed or semi-frameless glass door adds $500 – $1,200. A properly installed curved or straight rod with a fabric curtain can buy you a year or two to add the glass later.
  • Get the waterproofing scope in writing. Ask what waterproofing system will be used and what the warranty term is. Some companies use a waterproofing membrane with a written manufacturer warranty. That prevents the expensive failure that costs many times the initial install to fix.
  • Have a written price before any work starts. We say this a lot, but it’s the labor-cost protection. Brad…

Call (904) 337-5929 for an exact quote on your tub-to-shower conversion. Estimates are free, and the number we write on your proposal is the number you pay. No reprice at the door. No surprise line items the day of the job. That’s the Garrison Standard, and it’s been the way we work since 2004.

Is It Cheaper to Convert or to Replace with a New Tub?

Replacing a tub with a new tub typically runs $1,800 – $4,000 installed in Jacksonville, compared to $3,500 – $10,000 for a tub-to-shower conversion. A tub replacement is cheaper because it maintains the existing plumbing layout, no shower base is required, and the surround is often less complicated to install. But the two projects solve different problems. If the issue is simply that the old tub is chipped, stained, or holding water poorly, a replacement is a sensible, lower-cost answer. If the issue is that someone in the home has trouble stepping over the tub wall, or the household simply never uses a tub, the conversion is the better long-term move because it changes the function of the room, not just the fixture.

Resale-wise, a home with no tub at all can be a factor for families with young children. If you have a second full bathroom with a tub, converting the primary bathroom to a shower typically costs you nothing at resale. If it’s a one-bathroom home, keeping the tub may matter. In a one-bath home, a tub that’s in decent shape and used rarely should probably stay. If a tub-to-shower conversion is necessary for mobility reasons, the accessibility improvement outweighs the resale math. Whatever your situation, we’ll give you our honest read. That’s part of the job, and it’s free to ask on a home consultation.

Can You Convert a Tub to a Shower in One Day?

No. A quality tub-to-shower conversion in Jacksonville takes two to five working days, and any company that promises a one-day conversion is cutting a step. The demolition and rough-in happen on day one. Waterproofing and substrate preparation happen next, with time allowed for the membrane or backer board to set correctly. Wall installation and finish plumbing follow. If tile is involved, there’s drying time between waterproofing and tile setting, and then time for grout to cure before the first shower. Acrylic surround conversions are faster, sometimes two to three days, because the bonding process doesn’t have tile dry-time. But even the fastest conversion should include an inspection on the plumbing rough-in, and the inspector’s schedule runs on the city’s clock, not the contractor’s. Bradford Remodeling schedules the work in a sequence that respects material dry times and inspection windows. Our promise is not that it’s done in one day. It’s that it’s done right, and that’s in writing, backed by the 365-Day Done Right Promise.

Does Converting a Tub to a Shower Increase Home Value in Jacksonville?

It depends on the bathroom and the buyer. In Jacksonville’s housing market as of 2026, the pool of buyers who want a walk-in shower in the primary bathroom is larger than the pool who want a soaking tub, particularly among buyers over 50 and those looking at ranchers and single-story homes in neighborhoods like Lakewood, San Jose, and the Southside. A well-executed conversion, done with a documented waterproofing system, a quality valve, and solid finish work, typically helps the home show better and sell faster. That said, the work returns roughly 60 – 70 cents on the dollar in immediate resale value, which is average for a mid-range bathroom project. You do this for daily function, not to flip equity. If you’re planning to sell within two years and the tub works fine, keep the tub. If you’re planning to live in the home and the tub is unused, dangerous to step over, or an eyesore, convert. Convert once, convert right.

How Much Does a Walk-In Shower Cost Without the Tub-to-Shower Scope?

A new walk-in shower in Jacksonville, built from scratch where no tub existed, ranges from $4,500 to $12,000. That’s a broader range than a tub-to-shower conversion because it may involve adding or relocating plumbing, framing a new enclosure, and working with a custom footprint. When we build a walk-in shower where a tub never existed, the plumbing rough-in is more involved, especially in slab-on-grade homes where the drain has to be cut into the concrete. A tub-to-shower conversion, by contrast, uses the tub’s existing supply and drain location as the starting point, which tends to keep the plumbing line item at the low end of the range. The page we’ve linked just above covers the walk-in shower pricing in more detail, including the cost differences by wall material and base type.

What Questions Should You Ask Before Signing a Tub-to-Shower Conversion Contract?

Ask who pulls the permit, what waterproofing system will be used, what the warranty covers, and whether the price on the proposal is the final price. Then ask to see it in writing. A contractor who hesitates on any of those four questions is telling you something. Ask whether the crew arriving at your door is background-checked and whether you’ll know who’s coming before they arrive. Ask what time the crew starts and where the debris goes. In Jacksonville, ask specifically whether the contractor is familiar with the city’s plumbing inspection process and the specific waterproofing requirements the inspector will check before the walls close. Ask for the brand and model of the valve that’s included, not just “a quality valve.” Those are the questions we answer every day, and every answer belongs on the proposal in writing. The answers should come in writing before work starts. That’s how Tub-to-Shower Conversion in Jacksonville work is done under The Garrison Standard.

FAQs – Tub-to-Shower Conversion Cost in Jacksonville

How much does a tub-to-shower conversion cost in Jacksonville, FL?

A tub-to-shower conversion in Jacksonville costs $3,500 to $10,000, with most homeowners paying between $6,000 and $8,500 for a standard 5-foot alcove conversion with mid-grade finishes. The final number depends on wall material, plumbing scope, waterproofing system, and whether the tub footprint changes. Call (904) 337-5929 for a free written estimate with an itemized line-by-line price.

What is the cheapest way to convert a tub to a shower?

The cheapest way is to keep the existing 60-inch tub footprint, use a prefabricated acrylic base and surround, install a single-outlet pressure-balanced valve, and use a curtain rod instead of a glass door. In Jacksonville, that scope typically runs $3,500 – $5,000 installed when the plumbing and framing are in good shape. We’ll give you the exact number in writing before work begins.

Does a tub-to-shower conversion require a permit in Jacksonville?

Yes. Any project that modifies the plumbing drain, trap, or supply lines requires a plumbing permit from the City of Jacksonville or the local beaches municipality. The permit typically adds $100 – $400. The inspection that comes with it confirms the rough-in plumbing and waterproofing are done to code, which protects the homeowner from hidden defects and future resale problems.

Is converting a tub to a shower worth the cost?

For most Jacksonville homeowners who use the tub rarely and value a step-in shower, yes. The conversion typically costs $3,500 – $10,000, improves daily function, and helps the home appeal to a broad range of buyers. It’s not a high-returning resale project, but the benefit is measured in daily use, not just dollars at closing. If accessibility is a factor, the value is immediate and not reflected in resale math.

How long does a tub-to-shower conversion take?

Two to five working days, depending on wall material and inspections. Acrylic surround conversions run two to three days with a plumbing inspection. Tile conversions run three to five days because of waterproofing dry time and tile setting. The city’s inspection scheduling can add a day or two in Jacksonville. We’ll give you a schedule in the proposal and stick to it.

How much does it cost to replace a tub with a walk-in tub instead of a shower?

A walk-in tub is a different project and typically runs $5,000 – $15,000 installed in Jacksonville, depending on the tub model and the door configuration. That’s higher than most tub-to-shower conversions because the tub itself is a specialized fixture with a watertight door, and the electrical requirements often need a dedicated circuit. For most people weighing the two, the question is really about mobility and how the bathroom will be used every day. We can help you compare both options during a free consultation.

Call (904) 337-5929 for a free, no-pressure estimate on your tub-to-shower conversion. Curtis Lane and the Bradford Remodeling team will give you a written price, a written scope, and a written 365-day guarantee. Live people answer the phone, 24 hours a day. If it’s not done right, we make it right. That’s the job.

Pricing reflects the Jacksonville market as of 2026. Bradford Remodeling Co Jacksonville offers free estimates – call (904) 337-5929. Written by Curtis Lane, Owner at Bradford Remodeling Co Jacksonville, serving Jacksonville since 2004.

What Our Customers Say

★★★★★ 4.9 from 7+ reviews

"Home remodel with a new floor plan. Handled structural work and permits without drama."

- Gus R.

"Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."

- Cal P.

"Replaced old windows and trim while redoing the kitchen. Clean finish work."

- Ron F.

Ideas for every room in the house

Built-ins, window seats, family rooms and staircases: the changes that make a whole house work better.

Read our remodeling guides
A single-story rear room addition with tall windows and a new patioAn open kitchen and dining area after a remodelA remodeled family room with new windows and a window seatA wide opening with a new beam where the kitchen wall was removedA stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled primary suite with built-in wardrobes and a window seat

Explore more remodels

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Bradford in Jacksonville

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your Jacksonville team

A local crew that works across Jacksonville and the towns around it, to the same written standard as every Bradford location.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Jacksonville? Licensed & insured · Written quotes before work starts response · free estimates
Call (904) 337-5929

Request a Free Estimate

Tell us what's going on in Jacksonville - we'll get back to you fast. No obligation.

When you send us your details, you confirm you have read our Privacy Policy and agree to be contacted by call, text, or email regarding your project, including by the service partners who may complete the work.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch